Sneak Preview: Pmld Wind Farm Construction – Blade Lift

March 12, 2010 · 3 comments

in wind energy


Time-lapse film shows an 80,000 pound set of blades being hoisted 300 feet and attached to the nacelle of of a wind turbine being erected on Wachusett mountain in Princeton, MA.

Two Fuhrländer 1.5…

Leave a Comment

This blog is kept spam free by WP-SpamFree.

Previous post:

Next post:

</