Shakopee Mdewakanton Sioux Community Wind Turbine

January 26, 2010 · 1 comment

in wind energy


After more than 10 years of planning, the new 1.5 megawatt wind turbine at the SMSC Pow Wow Grounds has arrived and is assembled. At 386 feet from foundation to the tip of a blade fully extended ve…

Leave a Comment

This blog is kept spam free by WP-SpamFree.

Previous post:

Next post:

</